May Kalabutan nga mga Produkto
1.Pag-scale sa 1.Prpodaction: 1 SzlH3020-7
1. Degree Degree sa Vacuum, ang ratio sa injection sa lana mahimong moabot sa 30%;
Ang Atong Misyon: Kanunay Paghimo Valuha sa Kliyente
4. STELEL STRUCT PINAAGI SA PINAAGI.
The project started construction in September 2020 and was completed and put into production in April 2021. It will be produced at full capacity in 2022. The current monthly output is about 8,000 tons, with the highest single-day production exceeding 300 tons.